Balance · 2
The maximum possible track length on the Steel Hydra coaster was increased.
possible track lengthRides in the Downtown scenario now have bigger age gaps.
ride age gap
Content · 2
Bins that were hidden inside walls in the Downtown scenario were moved into open areas.
bin placementZoZo was added to the work roster for the Downtown scenario.
work roster
UI · 1
The visual quality of the Steel Hydra chain lift, brakes, catwalks and support colours was improved.
visual quality
Fix · 6
The Pirate Fence scenery piece was reset to its original rotation.
rotationInteractive music now plays correctly on the Boomerang coasters.
interactive music playbackBrowser categories no longer change when the browser is closed and reopened.
browser categoryScenery parts with changeable colour were loading the wrong colour and this has been fixed.
changeable colour loadingCoaster stations can now be selected in work rosters.
work roster selectionThe Bakasura coaster now creates track supports when the track is banked.
track supports on banked track
General · 1
General stability fixes and improvements were made.
general


