Balance · 1
The construction times for new buildings were halved.
new building construction time
Fix · 2
Evaporation was being calculated incorrectly in some scenarios and this has been fixed.
evaporation calculationBuildings placed on top of the Upward Power Shaft now connect to roads properly.
road connection for building
General · 1
An extra hotfix was shipped at the end of the day, though the document names no specific change for it.