Workers & Resources: Soviet Republic

3Division · Simulation

Workers & Resources: Soviet Republic patch notes · Nov 29, 2024

Experiment

New version 1.0.0.10

What's new in New version 1.0.0.10: 29 changes to Workers & Resources: Soviet Republic, released Nov 29, 2024.

Balance · 1

  • The effect of the hardening research for Siberia was increased.

    hardening research effect

Content · 5

  • Three new types of road cargo stations were added.

    road cargo station
  • The Ukrainian localization was updated.

    ukrainian localization
  • The Czech localization was updated.

    czech localization
  • New factory connections and conveyor inputs were added to these four plants.

    factory connections and conveyor input
  • Larger space was introduced for vehicles and containers.

    vehicle and container space

Economy · 2

  • The cost of machine replacement for the large chemical plant was adjusted.

    large chemical plant machine replacement cost
  • The price of beam concrete bridges for trams, which was too low, was corrected.

    beam concrete bridge price for tram

UI · 1

  • Tram and metro icons were updated in the repair office.

    tram and metro icon

Fix · 20

  • An additional issue causing circular roads to appear at crossroads was fixed.

    circular roads at crossroad
  • Train cars becoming unjoined when a locomotive from a line with new or used trains was called to the depot for repair was fixed.

    train car unjoining on depot repair
  • A crash occurring when upgrading a bridge that was already electrified was fixed.

    crash on upgrading electrified bridge
  • An issue with reconstruction, cranes from CO, and an endless loop involving certain vehicles was resolved.

    reconstruction crane endless loop
  • The rendering of train sets on ships and in storage was corrected.

    train set rendering
  • An issue with heating plant notifications when the plant is closed due to warm temperatures was fixed.

    heating plant notifications when closed for warm temperature
  • Construction office vehicles could access the source building via the footpath; this was fixed.

    construction office vehicle footpath access
  • A crash that occurred when demolishing underground pipes was fixed.

    crash on demolishing underground pipe
  • An attempt was made to fix the death spiral issue caused by crime.

    death spiral issue caused by crime
  • Obsolete vehicles becoming purchasable after 1996 was fixed; only vehicles available in 1995 remain accessible and no new developments occur after that year.

    vehicle availability after 1996
  • A problem where a very large area could be selected by mistake during batch updates was fixed.

    batch update area selection
  • A problem with signals when unloading new or used train cars was fixed.

    signals when unloading new or used train car
  • Newly joined or used train cars not being displayed in the locomotive window was fixed.

    locomotive window display of joined or used train car
  • Waste wagons being loaded with custom waste despite a schedule set for different resources was fixed.

    waste wagon loading
  • Production plants operating at 100% capacity without storage space for finished vehicles was fixed.

    production plant capacity without storage
  • An issue with smooth terraforming of terrain was fixed.

    terrain smooth terraforming
  • The wrong waste material being loaded due to an advanced vehicle's cargo setup was fixed.

    waste material loading with advanced vehicle cargo setup
  • Two vehicles being sent and miscalculated explosives amounts were resolved.

    demolition office explosives dispatch
  • Purchasing vehicles at the custom house could lead to an infinite loop during vehicle replacement; this was fixed.

    infinite loop in vehicle replacement
  • A UI bug in the pumping station was fixed.

    ui bug