The construction system is described as not yet fully completed, so wall interior elements cannot be upgraded and outer walls cannot be upgraded to metal.
construction system completenessThe electrification system operates in a primitive mode where one switch in a carriage toggles all light sources in that carriage, a temporary solution.
electrification system
Fix · 1
Saving and loading of save files was partially repaired, though some saves may still give an error and force a restart.
save file loading
Also in this patch2
The nature sound attenuation system does not work once all walls and ceilings are erected; this is noted as a known problem to be addressed later.
nature sound attenuationPlanned future ability to link switches individually to create separate groups of luminaires.